Explore: Margin Calculator Salary vs Dividend Calculator | Construction E-commerce | Sample Management Accounts UK Services
UKHMRCR&D Tax CreditsTaxInnovation

R and D Tax Credits 2026: SME Scheme vs RDEC Merger

The April 2024 merger of the SME and RDEC research and development schemes cut typical claims sharply. A plain guide to the merged scheme, with examples.

By Stuart Wilson, ACMA CGMA · · 13 min read

The April 2024 merger of the SME and RDEC R&D tax credit schemes was the biggest UK innovation-relief shake-up in two decades, and HMRC's published guidance is — to put it gently — opaque. This guide reconstructs the rules in plain English, with worked examples, so you can model what you actually receive in 2026 vs what you were getting in 2023.

What actually changed in April 2024

Before April 2024 the UK had two parallel R&D regimes:

For accounting periods beginning on or after 1 April 2024, those two are gone. There is now one merged scheme that looks like RDEC, plus an enhanced "R&D intensive" carve-out for very R&D-heavy loss-making SMEs.

The merge was billed as simplification. In practice, for a typical loss-making SME that was claiming the old 33.35% effective benefit, the new headline rate is closer to 16.2% net of tax — a real-terms cut of more than half. Profit-making companies fared slightly better but still saw a reduction.

The new merged R&D scheme — how it works

The merged scheme is a 20% above-the-line credit on qualifying R&D expenditure. "Above the line" means the credit is treated as income (taxable), then offset against any corporation tax liability. The net benefit after corporation tax is roughly 15% for companies at the 25% main rate, or 16.2% at the 19% small profits rate.

Company positionGross creditCorporation tax on creditNet benefit
Profit-making, main rate (25%)20% × R&D spend25%~15.0%
Profit-making, small profits (19%)20% × R&D spend19%~16.2%
Loss-making (no CT to offset)20% × R&D spend19% (notional)~16.2% as a cash repayment

Subcontracted R&D is now claimable by the company that decided to do the R&D, not the subcontractor. This is the single biggest behavioural change. Previously many software development agencies claimed R&D on work commissioned by their clients; now the claim sits with the client (assuming the client made the R&D decision). Some agencies have lost 30–60% of their historical R&D claim under the new rules.

Connected-party subcontracting is restricted to actual cost (no markup). Externally provided workers (EPW) — typically through agencies or contractor companies — are claimable but capped at the actual cost paid to the provider.

Enhanced R&D intensive support (the "Cliff Edge" rescue)

The single biggest preservation of the old SME scheme is the Enhanced R&D Intensive Support (ERIS). Loss-making SMEs whose R&D expenditure is at least 30% of total expenditure get to claim under a much more generous formula:

The 30% threshold is calculated on total tax-deductible expenditure of the company and connected parties for the period. If R&D spend is £600,000 and total expenditure is £1.8M, you are R&D intensive (33%). If total expenditure is £2.2M, you are not (27%).

There is a one-year grace period: a company that qualifies as R&D intensive in one period and dips just below 30% the following period can still claim ERIS for that period (the "year of grace"). This was introduced to stop genuinely R&D-intensive companies losing the benefit due to a single quarter of unusual spending.

Worked examples — three companies, three outcomes

Company A — Profitable SaaS, £200K qualifying R&D

Profitable software company, £4M revenue, £200K qualifying R&D spend, paying CT at the small profits rate (19%):

Under the old SME scheme: £200,000 × 24.7% = £49,400. Reduction: £17,000.

Company B — Loss-making not R&D intensive, £500K qualifying R&D

Pre-revenue SaaS startup, £500K R&D spend, £2M total expenditure (R&D = 25%, below 30% threshold), pre-tax loss of £1.5M:

Under the old SME scheme: £500,000 × 33.35% = £166,750. Reduction: £85,750 — over half.

Company C — R&D intensive loss-making, £600K qualifying R&D

Same company as B but with £1.8M total expenditure instead of £2M (R&D = 33%, above threshold):

This is the case where ERIS becomes life-or-death cash flow. R&D intensity reviews are now a standard tax planning exercise — small reclassifications of expense categories can flip a company over the 30% line.

What still qualifies as R&D (tightening since 2023)

HMRC's R&D enquiry rate has roughly tripled since 2022. Software claims are scrutinised hardest. The core test is still BIS Guidelines: an advance in science or technology, achieved by resolving scientific or technological uncertainty, by a competent professional in the field. But what HMRC is rejecting in 2025/26 enquiries:

Software claims should be supported by a competent professional's narrative naming the specific technological uncertainty, the experimental approach taken, what failed, and what advance the project achieved beyond the publicly available baseline.

Claim timing and the new pre-notification rule

For accounting periods beginning on or after 1 April 2023, new claimants (or claimants who haven't claimed in the previous three years) must submit a claim notification form to HMRC within 6 months of the end of the period of account. Miss this and your claim is invalid — no late-claim option, no appeal.

Example: period of account 1 January 2026 – 31 December 2026. Claim notification deadline: 30 June 2027. The actual claim itself can still be filed within the normal two-year window via the CT600 return, but the pre-notification is the trip-wire.

Established claimants who have submitted R&D claims in any of the previous three periods do not need to pre-notify. But miss three consecutive years and you reset to "new claimant" status.

Why the claim now has to live in the management accounts

R&D claims have moved from "specialist boutique product" to "audit-grade exercise." The boutique R&D advisory firms that charged 25% of claim value are losing clients — partly because HMRC's tightening makes their methodology untenable, partly because the smaller post-merger benefit no longer supports their fees.

Three things now matter that a once-a-year adviser cannot do for you: keeping the contemporaneous project documentation HMRC requires, tracking R&D intensity through the year (so you know before year end whether you will cross the 30% threshold), and recording qualifying costs in the management accounts as they happen, so HMRC does not find post-hoc adjustments at enquiry. That is a bookkeeping and reporting set-up job. Our monthly bookkeeping and management accounts (from £295/month) can carry R&D cost tracking as a standard part of the pack.

Send your details — we reply within one business day, by email if you want a sanity check on your 2026 R&D position — particularly if you're close to the 30% R&D intensity threshold.

🏦 Group FD, SME Portfolio · CIMA Chartered
📊 CIMA Chartered Since 2013
⚡ Reports by the 5th — Every Month
🛡️ Prices Published in Full

Free Sample Management Pack

Sample management accounts, a KPI dashboard and a 13-week cash flow template, built on clearly labelled demo data. See what a finished monthly pack looks like before you decide anything.

Want a straight answer on your own numbers?

Tell us what is going on with your books, accounts or tax. You'll get a written reply by email within one business day from Stuart Wilson (ACMA CGMA, 7 years as Group FD for an SME portfolio, 24 years in finance).

Send My Details →
Confidential · No pitch · No obligation
Send My Details